Updated PDF (New 2021) Actual SAP C-TPLM30-67 Exam Questions
Verified C-TPLM30-67 Exam Dumps PDF [2021] Access using Pass4cram
C-TPLM30-67 Exam Certification Details:
| Exam: | 80 questions |
| Cut Score: | 51% |
| Duration: | 180 mins |
| Level: | Associate |
| Languages: | German, English |
| Sample Questions: | SAP C-TPLM30-67 Exam Sample Question |
SAP C-TPLM30-67 Exam Syllabus Topics:
| Topic | Details |
|---|---|
| Topic 1 |
|
| Topic 2 |
|
| Topic 3 |
|
| Topic 4 |
|
| Topic 5 |
|
| Topic 6 |
|
| Topic 7 |
|
| Topic 8 |
|
NEW QUESTION 37
Your customer wants to create a component for maintenance that does not allow physical inventory.
Which material type must you use?
- A. Non-valuated materials (UNBW)
- B. Maintenance assembly (IBAU)
- C. Spare parts (ERSA)
- D. Operating supplies (HIBE)
Answer: B
NEW QUESTION 38
Which of the following always produces up-to-the-minute costing information for maintenance orders?
- A. A shift report based on shift notes
- B. A maintenance order list
- C. A standard analysis from the Plant Maintenance Information System (PMIS)
- D. A standard query in SAP NetWeaver Business Warehouse
Answer: B
NEW QUESTION 39
A customer has a dual controller system, two independent Fibre Channel switches, and six servers all multipathed. How many zones should be present on each for the SAN to run properly in Virtual Port Mode?
- A. 0
- B. 1
- C. 2
- D. 3
Answer: B
NEW QUESTION 40
You want to set up an external refurbishment process through subcontracting, using material requirements planning (MRP)?
Which of the following must you set in the system?
- A. The Special Procurement indicator in the material master record.
- B. The Material Provision indicator for special stock in the refurbishment order header.
- C. The Subcontracting flag in the refurbishment order header.
- D. The Subcontracting flag for the refurbishment order type.
Answer: A
NEW QUESTION 41
Your customer wants to generate costing for internal activities.
For which of the following can you define various rates in Activity Type/Price Planning transaction?
There are 3 correct answers to this question.
Response:
- A. Value category
- B. Cost center
- C. Plan/actual version
- D. Period
- E. Plant
Answer: B,C,D
NEW QUESTION 42
Plant maintenance strategies involve the following steps. Identify them
There are 3 correct answers to this question.
Response:
- A. RBI
- B. BAT
- C. RCM
- D. TPM
- E. CAA
Answer: A,C,D
NEW QUESTION 43
What does the structure indicator for a functional location determine? (Choose three)
- A. The number of characters for each hierarchy level
- B. The functional location category
- C. The edit mask
- D. The functional location type
- E. The number of hierarchy levels for a particular structure
Answer: A,C,E
NEW QUESTION 44
What options are available in the maintenance order when you analyze costs using value categories?
(Choose two)
- A. Display of costs by responsible work center
- B. Summary of actual costs across multiple cost elements
- C. Display of values in an alternate currency
- D. Display of costs by individual operations
Answer: B,D
NEW QUESTION 45
What are the prerequisites for installing equipment at a functional location? (Choose two)
- A. The functional location master record allows the installation.
- B. A fixed asset is assigned to the equipment.
- C. The equipment category of the equipment allows the installation.
- D. A cost center is assigned to the equipment.
Answer: A,C
NEW QUESTION 46
Which of the following steps must you perform to customize priorities for a maintenance order?
Please choose the correct answer.
Response:
- A. Assign a priority type to a technical object master record.
- B. Assign a priority type to an order type.
- C. Assign priorities to order types.
- D. Assign priorities to technical object master records.
Answer: B
NEW QUESTION 47
To display overhead costs in a maintenance order, you need to assign a costing sheet in Customizing.
To which parameter do you assign the costing sheet?
Please choose the correct answer.
Response:
- A. Valuation categories
- B. Valuation variant
- C. Version for cost estimates
- D. Costing type
Answer: B
NEW QUESTION 48
To which maintenance object types can you link a priority type?
There are 2 correct answers to this question.
Response:
- A. The combination of the notification category and notification type
- B. The order type only
- C. The notification type only
- D. The combination of the order category and order type
Answer: A,B
NEW QUESTION 49
A company is using an SC7020 array and the storage administrator wants to expand the available capacity by adding 48, 3.5" disk drives. Which expansion enclosures can be used to meet the demand?
- A. 2x SC220 drive bays
- B. 4x SC200 drive bays
- C. 4x SC400 drive bays
- D. 2x SC420 drive bays
Answer: A
NEW QUESTION 50
In order costing configuration, for what is the allocation structure used?
- A. To allocate costs to a hierarchy of maintenance technical objects
- B. To determine the cost elements that are allowed in the plant maintenance order
- C. To provide a method of consolidating costs in the Plant Maintenance Information System
- D. To determine the settlement receiving elements for costs debited to the order
Answer: D
NEW QUESTION 51
A maintenance plan has a completion requirement. The plan contains five maintenance items that produce five notifications.
Which system status must each notification have before the maintenance call is completed and the next maintenance call can be generated?
- A. TECO (Technically Completed)
- B. REL (Released)
- C. NOCO (Notification Completed)
- D. ATCO (All Tasks Completed)
Answer: C
NEW QUESTION 52
Which of the following rules applies to user status in orders and notifications?
Please choose the correct answer.
Response:
- A. When a user status is flagged as an initial status, it overrides the initial system status CRTD.
- B. Changes to the user status can affect authorizations.
- C. When you set a new user status with a status number, the previous user status with status number is deactivated.
- D. The user status in the notification can be copied into the order.
Answer: C
NEW QUESTION 53
How does SAP make new functions of the SAP ERP application available to customers?
- A. Via enhancement packages
- B. Via add-ons
- C. Via best practices
- D. Via Support Packages
Answer: A
NEW QUESTION 54
Which statements apply to a client in an SAP system?
Choose the correct answer(s).
Response:
- A. A client corresponds to a customer.
- B. In business terms, the client is a completely independent unit.
- C. Each client has their own database.
- D. A client can represent the mapping for an entire enterprise.
Answer: B,D
NEW QUESTION 55
Identify the business purpose for which work center data is used
There are 2 correct answers to this question.
Response:
- A. Public order
- B. Personnel data
- C. Notifications
- D. External information
- E. Costing
Answer: B,E
NEW QUESTION 56
......